| Version | Released | Summary of additions | Summary of Deletions |
|---|
| 26.10.01 | 2026-09-26 00:00:00 | -- Major improvements with the Projects tools, Projects now build of the same feed logic as the layer 6 projects
-- continue building the v0.5 version of the api system that properly updates the content within the system usinf JSON.
---- Add more security into the endpoints requiring the users fingerprint to be allocated to the correct session id and that sessionid needs to have beed used within the last 30 minutes
---- currenty there are about 54 endpoints currently exist under api/v0.5. Breakdown by resource:
---The projects (12) and teams (3) directories include everything we've built together this session: create-simple.biz, details.biz, timesheets-start.biz, timesheets-stop.biz, and manager-add.biz/crew-add.biz/supervisor-add.biz. | -- many old version of the basic form based endpoint ( just pure SQL will be no longer required now that the proper endpoints exist. |
| 26.09.01 | 2026-09-21 00:00:00 | -- Major improvements with the Projects tools, Projects now build of the same feed logic as the layer 6 projects
-- building the v0.5 version of the api system that properly updates the content within the system usinf JSON.
---- Add more security into the enpoints requiring the users fingerprint to be allocated to the correct session id and that sessionid needs to have beed used within the last 30 minutes
---- currenty there are about 45 endpoints that have been created accross about 8 classes/services | -- many old version of the basic form based endpoint ( just pure SQL will be no longer required now that the proper endpoints exist. The new versions that havee been created in the last couple of months are flag as ( Sent to API) |
| 26.07.05 | 2026-08-27 00:00:00 | -- Major improvements with the my jobcoding tools.
-- JOBcoding effectively split into two Distinct phases..pahase 1 ( levellinang and Rating) ( phase 2 ( approval and allocation and customisation)
-- Automapp jobcodes for phase 1 or phase 2 based on status | -- the full jobcoding and allocation and approvals process can be virtually be done in just 2 JSON based products ( all other sub products will be move to superseded ( S) |
| 26.07.04 | 2026-08-17 00:00:00 | -- Major improvements with the my jobcoding tools.
-- continue rebuilding around api fetching and delivery
-- more improvements with moving to the feed based projects built on JSON more consistant with the Layer 6 of the ontology | -- Many products will not be requred with this JSON method of building content instread of the multiple products required for each step in the process. |
| 26.07.03 | 2026-08-10 00:00:00 | -- Major improvements with the my ontology playbook direct integration of the Journalling function into the playbook.
-- continue rebuilding around api fetching and delivery
-- More platform development with javascript and css files. And a number of hub and object specific css files all based on bootstrap 5
-- Continue build more specifically build api endpoint for content creation and management tools
-- Continue moved to standardised modal based content creation tools and support. | unknown |
| 26.07.02 | 2026-07-01 00:00:00 | -- Major improvements with the my ontology playbook workplace recognition leanrning card Structure.
-- continue rebuilding around api fetching and delivery
-- continuation of platform development with javascript and css files. And a number of hub and object specific css files all based on bootstrap 5
-- build more specifically build api endpoint for content creation and management tools
-- moved to standardised modal based content creation tools and support. | unknown |
| 26.07.01 | 2026-07-01 00:00:00 | -- cretion of platform javascript and css files. And a number of hub and object specific css files all based on bootstrap 5
-- continuing to restructuring of everything in to an ecocystem and pillars and hubs and modules and apps and tools,
-- moved to JSON based data loading and javascript based cards
-- build more specifically build api endpoint for content creation and management tools
-- moved to modal based content creation tools and support. | unknown |
| 26.05.02 | 2026-06-19 00:00:00 | -- cretion of platform javascript and css files. And a number of hub and object specific css files all based on bootstrap 5
-- restructuring of everything in to an ecocystem and pillars and hubs and modules and apps and tools,
- Colorcoded hubs and add some icons,
- created the starting of the MY ontology Paybook
- reimaginged how skill code validation is completed , one skill at a time and validated against the performance statements | unknown |
| 26.05.01 | 2026-06-01 00:00:00 | -- major rebuild of total system to bootstrap 5 and grid based CSS | unknown |
| 26.03.01 | 2026-03-01 00:00:00 | -- initial rebuild of naviation toolbars to enable multiple sub apps(applets) using the Capability Operating System COS
-- Add the MYSKILLS Scorecard
-- Add the concept of Capabily Operating System @pid=15000
---- Add navigation for all sub products that link back to COS
-- addedbasic voice to text functionality
----reviewed functional multiple PWA models
---- investigated multiple windows apps model based on chrome capabilities
-- Extended OSCA codes and performance statements to two more occupation groups
-- add additional landing pages | unknown |
| 26.01.01 | 2025-11-01 00:00:00 | --major improvements in JOB/LEARNcodes
---- rename all QUALcodes to LEARNcodes
---- Create the advanced JOBcode report/tool to use the word pictures to assist in JOBcoding
---- improvements in the labeling and filtering of JOB/LEARNcodes.
-- Improvements to the partner tools to COPY JOB/LEARNcodes
---- JOB/LEARNcodes can only be copied to Academy Managers and stored in the academy registered for that manager user.
---- JOB/LEARNcodes are copied as JUST JOBcodes or JOBcode with WLS or as fully customised JOBcodes.
-- better segmentation of the JOB SKILLS conversations, better deliniation of the MY JOB SKILLS (for me) and Mentoring JOB SKILLS (for someone else) | -- No need for the QUALcode module
-- Start to indentify other partner Tools that are no longer required |
| 25.11.01 | 2025-11-01 00:00:00 | --merging improvements in JOB/QUALcodes
---- restructure the way that JOB/QUALcodes are used. They are no longer user specific ( ie a JOBcode is required for every user) a JOB/QUALcode is assigned to a users
---- improvements to the matching tools to work with the new JOBcode allocation methodology
-- Initial creationg of a standalone Self Assessment toolbox that use the performance statements for selectedable preview and selectable OSCA occupations.
-- Other minor improvements to start to transiston to Bootstrap 5
-- other knowledge base tools to maximise the use cases for the OSCA data set.
****Parallel Development work has occurred outside to the main application archtecture to create a graph based API for the system. This will include a major upgrade of the whole system. | unknown |
| 25.09.01 | 2025-09-01 00:00:00 | --Implemented New login screen
-- Built a CARE dashboard for using the system in the context of Aged and NDIS context (all tools the same but limiatations on the just showing the tools hat are neede in this context | unknown |
| 25.07.01 | 2025-07-01 00:00:00 | --Massive rework of JOBcodes
---- Create Industry Standard Performance statements for all 421 occupational groups from OSCA- 2024
---- Redefine the standard report to highlight these statements
---- Auto show customised statements (if they have been customised
----initial experimentation with integrating AI into the system | unknown |
| 25.05.01 | 2025-05-01 00:00:00 | -- Verified Workplace Skills (portals)
-- SRP/RPL projects version 2 (portals)
--- Autobuild Evidence Projects based on SRP
--- Integrate Competencies into focused evidence base projects
--- Auto include to RPL project posts to evidence base
-- Create NDIS prototype
-- Phase one of the Dashboard prototyping
-- revision of the user roles within to add more functioanlity for the special focus dashboards | -- Removal of Evidence Projects from SRP dashboads |
| 25.03.01 | 2025-03-01 00:00:00 | -- Verified Workplace Skills
-- SRP/RPL projects version 1
-- Auto include to RPL project posts to evidence base | -- Removal of Evidence Projects from SRP dashboads |
| 25.01.02 | 2025-02-17 00:00:00 | -- Formalisation of the self assessment tool apps , Versipn 2 | unknown |
| 25.01.01 | 2025-01-01 00:00:00 | -- Formalisation of the self assessment tool apps | unknown |
| 24.11.01 | 2024-11-01 00:00:00 | -- minor Improve project bages for Evidence | unknown |
| 24.09.01 | 2024-09-01 00:00:00 | - Completion of the Perfromance Evidence base for skillcodes
- Evidence is referenced for each individual Empowerment skill
- Evidence can be linked to Experiences, Projects of actual posts within a project
-Performance evidence is made up of all linked evidence within the skill for that user for the current Skillcode only.
- Improve project bages for Evidence | -Remove the project badge mapping error in Evidence tags |
| 24.07.03 | 2024-08-18 00:00:00 | - Completion of the evidence base for skillcodes
- Evidence is referenced for each individual Empowerment skill
- Evidence can be linked to Experiences, Projects of actual posts within a project
-The evidence is made up of all linked evidence within the skill for that user to ensure that evidence doesn't need to be reloaded. | unknown |
| 24.07.02 | 2024-08-11 00:00:00 | -Integrate Fully Competency evidence collection mapping from elements | unknown |
| 24.07.01 | 2024-07-01 00:00:00 | -Minor improvement | unknown |
| 24.05.01 | 2024-05-01 00:00:00 | -Minor improvement | unknown |
| 24.03.01 | 2024-03-01 00:00:00 | -Minor improvement | unknown |
| 24.01.01 | 2024-01-01 00:00:00 | -Minor improvement | unknown |
| 23.11.02 | 2023-11-28 00:00:00 | - imporvements to the survey calculations process | - Updates required to the Qz_ tables |
| 23.11.01 | 2023-09-15 00:00:00 | - make SRP Dashboard major improvments - widget improvements
- Improve linkages between MYSKILLSmanager and Business Risk assessments for WHS, Quality and Physchosocial Hazards
- Introduce Self Assessment tools | unknown |
| 23.09.02 | 2023-09-15 00:00:00 | - make SRP Dashboard major improvments - widget improvements
- Start api integration data structure methodology
- Introduce the concept of Independent Dashboards
- Business Risk assessments for WHS, Quality and Physchosocial Hazards | - Database modifications
- Add API_ID and API_REF to WS_reg
-Add CM_API_KEYS
- update fb _reg |
| 23.09.01 | 2023-09-01 00:00:00 | - make SRP Dashboard responsive
- Start accurate timesheet costing setup | - |